Stockton, CA

[Slideshow]
Type
Industrial
Use
2 Media Filter Digesters
Location
Stockton, CA
Construction
2 Glass-Fused-to-Steel Tanks
Size
165′ D x 28′ H
Roof
N/A
Gallons
2,009,350 Each Tank
Cost
966,045
Total Duration
3 Months

Stockton is situated at the head of a navigable channel, several miles east of the San Joaquin River and approximately 90 miles from San Francisco Bay.The cities strategic location along several waterways is what defined Stockton and its surrounding communities.

This project consists of building two large Glass-Fused-to-Steel tanks for media filter digestion. The water is filtered in the tanks before emptying into the bay. We were able to successfully install 60 tank sheets a day on this project. Our on site crews were awarded contractor of the month for two consecutive months while working on this project.

This project was completed under Rod Shearer with a previous firm.